This client had purchased the property and planned to add a new building. The first step was clearing the land.
He asked us to clear about 1 acre of oak trees. The trees needed to be felled, the stumps removed, and all brush and debris hauled off site and disposed of.
BeforeTaking Down Trees and Pulling Stumps
We felled all of the trees and removed every stump, separating the usable timber from the brush and debris as we worked.


Hauling It All Off
Everything was hauled off site: more than 4 log truckloads of timber and 60 dump truck loads of debris and vegetation. All of the stumps were taken to a private disposal site.


Rough Grading for the Next Step
With the site cleared, we rough graded the entire area and prepared it for the next phase: site preparation for a large commercial-style building. (See the next phase: building the commercial pad on this same lot.)

The Result
The trees were down, the stumps removed and everything hauled off in less than a week. The client was extremely pleased with both the results and the speed of the work.

Equipment Used
An excavator with a thumb, a compact track loader, dump trucks for debris, and log trucks for the timber.
What a Project Like This Costs
Typical range
$25,000 – $50,000
Clearing about an acre of mature trees with stump removal, hauling and rough grading, like this project, usually falls in this range.
What affects the cost
Every property is different, so the cost of similar projects can vary. The main factors are:
- Number and size of trees. Larger and more numerous trees take more time to cut, pull and haul.
- Stump removal. Pulling and disposing of stumps adds equipment time and disposal costs.
- Haul-off and disposal. The amount of timber, brush and debris and the disposal fees affect the total.
- Site access. Fences, buildings, power lines and nearby trees can slow the work.
- Grading after clearing. Rough grading to prepare for the next phase adds time.
Planning a similar project? We're happy to talk through what you have in mind and give you a free estimate.
Common Questions
What does land clearing for a new building include?
It usually means taking down the trees, pulling the stumps, removing the brush and debris, and hauling everything off-site. Then the area is rough graded so it's ready for site preparation.
How long does it take to clear an acre of trees?
It depends on the trees and access, but on this job we cleared about an acre of oak trees, pulled the stumps and hauled everything off in less than a week.
What happens to the trees and stumps after clearing?
On this project, the usable timber was hauled out by log truck, the brush and debris went out by dump truck, and the stumps were taken to a private disposal site.