The Project
This project was the house dig-out for a new home in Hillsboro: the excavation that prepares the site so the foundation can be formed and poured.
A good dig-out sets the tone for the whole build. The footprint needs to be on firm ground, the footings need to be in the right place, and the base needs to be level and solid.
Digging Down to Firm Soil
We excavated the entire footprint, removing the topsoil and soft material until we reached firm native soil. Building on undisturbed native ground helps prevent the foundation from settling over time.

Cutting the Footing Trenches
We cut the footing trenches around the perimeter of the house, following the layout, including the bump-outs. The footings carry the weight of the home, so the trenches need clean, straight sides and a firm bottom.
Building the 3/4" Minus Base
Inside the footings, we placed 3/4" minus across the footprint, then leveled and compacted it. The compacted rock gives the foundation and slab a firm, well-draining base and keeps the work area clean and usable for the next trades.

Soil Kept on Site
All of the excavated soil stayed on the property, where it can be used later for backfill around the foundation and for final grading. Keeping it on site avoided haul-off and disposal costs.
The Result
The site was left with a clean, level 3/4" minus pad and open footing trenches, marked and ready for the foundation contractor to begin.
Materials Used
3/4" minus for the base inside the foundation, leveled and compacted. All excavated soil was kept on site.
What a Project Like This Costs
Typical range
$10,000 – $15,000
House dig-outs like this one, with the footprint excavated, footing trenches cut and a compacted 3/4" minus base, typically fall within this range.
What affects the cost
Every property is different, so the cost of similar projects can vary. The main factors are:
- Size of the home. The footprint determines how much excavation and rock are needed.
- Soil conditions. How deep it is to firm native soil.
- Soil handling. Whether excavated soil can stay on site or must be hauled away.
- Haul distance. The distance between the quarry supplying the rock and the job site.
- Site access. Trees, slopes and existing structures can limit equipment and truck access.
Planning a similar project? We're happy to talk through what you have in mind and give you a free estimate.
Common Questions
What is a house dig-out?
A house dig-out is the excavation that prepares a site for a new home's foundation. It removes topsoil and soft material from the footprint, cuts the footing trenches and builds a level base for the foundation contractor.
Why put 3/4" minus under a house foundation?
A compacted layer of 3/4" minus creates a firm, level and well-draining base. It gives the foundation and slab a stable surface and keeps the work area clean and usable in wet weather.
What happens to the soil from a foundation excavation?
When there is room on the property, it can often stay on site to be used later for backfill around the foundation and for final grading, which avoids haul-off and disposal costs.
Planning Something Similar?
See our site preparation, excavation services and Hillsboro excavation, along with another new-home project: site preparation for a new home in North Plains. You can also request an estimate and we will evaluate your property.