Preparing Land for a Manufactured Home: What to Expect

Graded site in front of a new white home during site preparation in Rainier, Oregon

Preparing land for a manufactured home usually means getting permits and a site plan, clearing the site, building a firm driveway the delivery truck can use, grading a level pad that drains away from the home and trenching for utilities. Licensed trades make the final utility connections, and the ground is final graded after setup.

When Is the Best Time of Year for Excavation and Grading in Oregon?

Open lot graded smooth with a laser receiver in the ground in Columbia City, Oregon

In Northwest Oregon, late spring through early fall is the best time for most excavation and grading, because dry ground compacts properly and equipment does not rut the site. The wet season is better for watching drainage problems, planning, some clearing and urgent repairs. Book dry-season work in late winter or early spring.

What Goes Into a Pole Barn or Shop Building Pad

Gravel site prep pad with a new pole barn in Warren, Oregon

A good pole barn or shop pad starts on high, well-drained ground. The area is cleared and stripped of topsoil, graded so water flows away, then built up with crushed base rock compacted in thin layers and topped with 3/4″ minus. The pad should be larger than the building and level before the builder arrives.