The Project
These clients wanted a driveway that looked clean and uniform and functioned properly. When they purchased the house, the driveway had some rock on it. Over the years, they had added recycled asphalt from a local supplier, but that material was mostly soil and debris, and it detracted from the appearance of the entire driveway.
They were planning a large family event at the house and wanted the driveway finished beforehand.
Before
BeforeFixing the Main Driveway
The main driveway leading to the house was full of potholes and had poor drainage. I worked through it with a soil conditioner, cut out all of the potholes, regraded it and prepared it for new gravel.
Stripping the Turnaround and Parking Area
The main turnaround and parking area in front of the house and shop were stripped of the existing recycled asphalt, 3/4" minus and all other surface material. I then rough graded the entire area and prepared it for new gravel.
Installing New 3/4" Minus
I installed 3/4" minus over the entire surface. On the main driveway, we built the surface up about 8 inches so water flows off the sides rather than down the middle. This eliminates the conditions that cause potholes and will keep the driveway in good condition for years.
In front of the house and shop, we built gradual transitions and blended all of the surfaces together. We kept clean, defined edges, then graded and compacted everything for a clean, durable finish.
After
AfterSourcing the Best Rock
These clients wanted the highest-quality gravel available, but the nearest quarries only offered brown rock. The closest quarry with the quality of rock they wanted was a little over a 2-hour round trip away, and I hauled every load from that quarry.
The Result
The results speak for themselves. The entire driveway is now clean, uniform and built to drain properly.
AfterMy goal is always to provide the best value and finished product possible, and I will do whatever it takes to deliver that for my clients.
Materials Used
3/4" minus over the entire driveway, built up about 8 inches on the main strip, hauled from a quarry chosen for the quality of its rock.
What a Project Like This Costs
Typical range
$10,000 – $20,000
Complete driveway refinishes like this one, with old material stripped, potholes cut out and 3/4" minus installed over the whole surface, usually fall in this range.
What affects the cost
Every property is different, so the cost of similar projects can vary. The main factors are:
- Driveway size. The length and width of the driveway and parking areas, and the depth of rock required.
- Haul distance. The distance between the quarry supplying the rock and the job site. Choosing a farther quarry for better rock adds hauling time.
- Material pricing. Rock prices vary by quarry and by material type.
- Stripping old material. How much existing material needs to be removed before the new gravel goes down.
- Site access. Narrow paths, trees and slopes can limit equipment and truck access.
Planning a similar project? We're happy to talk through what you have in mind and give you a free estimate.
Common Questions
Is recycled asphalt good for a gravel driveway?
It depends on the source. The recycled asphalt on this driveway was mostly soil and debris, so it looked patchy and did not hold up. Clean 3/4" minus gives a uniform look and compacts into a firm surface.
Why build up the middle of a gravel driveway?
Raising the driveway and crowning it lets water flow off the sides instead of down the middle. Water running down the middle is what causes potholes.
Does the quarry matter for driveway gravel?
Yes. Rock varies by quarry in color and quality. The closest quarries to this home only had brown rock, so we hauled every load from a quarry over a 2-hour round trip away to get the nicest rock.
Planning Something Similar?
See our gravel driveway repair, North Plains driveway repair and North Plains excavation, or request an estimate and we'll take a look at your property.
← All success stories